 Marking the first stringer
|
 Verifying that the new stringer will fit
|
 Placing the first stringer
|
|
 Installing a backboard to hang the stringers
|
 |
 Using the first stringer to mark the others
|
|
 |
 |
 Using a stringer to mark the first skirt
|
|
 Google's Trimble SketchUp of the staircase
|
 |
 |
|
 4x4 aluminum footings on assembled stringers
|
 |
 |
|
 This hole is ready for its concrete pier
|
 ... ditto |
 |
|
 Wetting the pier holes before pouring concrete
|
 The PVC anchors pass through the aluminum feet
|
 The concrete is poured into the Sonotube form |
|
 |
 Covered to minimize evaporation
|
 |
|
 The shim will put the skirt even with the stringer
|
 Attaching the skirts
|
 Topping the skirt
|
|
 |
 Even with the pending plywood deck
|
 Predrilling the steps
|
|
 Predrilling the risers
|
 Attaching the steps, extensions and risers
|
 |
|
 Second coat of Bear Natural [not] Waterproofing
|
 |
 |
|
 Trimming the plywood overhang to fit the top riser
|
 Weep holes are drilled through this step extension |
 Glue seals the riser and plywood seam
|
|
 |
 |
 |
|
 |

|
 |
|
 |

|
 |
|
|
 |
This SketchUp plan was drawn before and during the project |