April 1970
|
November 2001
|
April 2002 after the stone wall was built
|
|
2012: Measuring for potential
|
A 4x6 gets the height of the platform
|
4x4s carry the platform until the posts are in |
|
The outside Frame is assembled
|
The southwest corner is cut to overlap a boulder
|
|
|
The southeast corner
|
Assembled! BUT forgot to make sure it is square
|
Temporary 2x4 legs carry one corner
|
|
Determining where this post will meet its pier |
Digging-chiseling the first post hole
|
3 of the 6 post piers were misaligned
|
|
|
|
|
|
So these concrete piers are off center
|
|
|
|
|
The rope in this pic has pulled the frame square |
... which pulled this corner way off center
|
|
The pipe should have penetrated the post center |
|
|
|
|
|
|
|
|
|
|
|
The Prius was able to drag this boulder with ease
|
|
|
|
Bracing the posts
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The plywood was coated twice with Bear Cedar Waterproofing |
The frame was coated twice with Bear Natural Waterproofing, an orange stain |