Building A Shed


page 4


05/11/06: almost 10 weeks into the job





Priming the cove moulding
to 'finish' the soffits


May 19, 2006






Cutting the dormer door Glueing, screwing and clamping a
hinge board to the wall-to-be
The heavy weight counteracts a
small warp in the plywood
Attaching a track for the sliding door
Thin wooden strips widen the
track so the door will slide easy

Various perspectives of the dormer wall


This cable system lifts the hinged wall
up and out of the way
The cable connects to the smaller eye bolt
Click on the image to read more

March 5 to June 3: 13 weeks from start to finish

West wall

North wall East wall South wall

The end