Building A Shed |
![]() |
![]() |
![]() |
|
04/01/06: nearly 4 weeks into the job |
The flashing will keep rain out of the dormer | ||
![]() |
![]() |
![]() |
|
Fitting the roof's overhang |
|||
![]() |
![]() |
![]() |
|
![]() |
![]() |
![]() |
|
![]() |
![]() |
||
Puttying and sanding the dormer floor and walls. Also erasing pencil marks. |
![]() |
![]() |
![]() |
|
The shed floor has been sanded | |||
![]() |
![]() |
![]() |
|
Urethaned the floor & 2 hanging poles for use in the house trailer |
![]() |
![]() |
||
Second coat of urethane on the floor and a coat on the wall-to-be |
![]() ![]() |