Cut hole
#18 out of loose bedrock & placed cardboard on the exposed side. The
barbed PVC anchor is ready to go.
|
With
everything very wet, filled the hole with concrete and plugged the anchor
into its pre-determined position in line with posts 5 & 4.
|
A 5” deep hole bored into the bottom of the post fits over the PVC anchor.
|
The same post from the opposite side.
|
With its
aluminum footing attached, it is doing its job. The width of this end of the
deck was determined by the position of this post, which was determined by
what the bedrock would quietly give me.
|
Here it is in all its splendor, just doin' its job.
|