Post 2      



 

Lined the 3' hole with roofing paper and dumped some wet rocks in to hold it in place.

Filled it with concrete and inserted a barbed PVC anchor. Will gently spill some water on it now and then over the next couple of days.

 

 

Bored a hole up the post and temporarily placed it over the PVC. Still needs its aluminum foot and a total linseed oiling, 50/50.

There it is, 2nd in line on the right.

To Post #1 ...

 

To Post #3 ...



Web Design © 2004, Van Blakeman